Joined
·
12,712 Posts
I got a 12 ft trailer , I can haul two ATVs but have the spin the first one on the trailer sideways , so we have an over night trip to the water park coming up soon, so yesterday I got on it , cut the side rail , moved the spare tire carrier , adding a tool box for straps , jack , straps , bunge cords , tools and what nots --------- the jack handle hits the box top by just a bit ----
I am looking for some suggestions on the placement and type of jack ----------------------
I could cut a spacer and put it under the triangle mounting plate of the jack , would loose a couple of inches of jack length but I use a block any ways , there are holes for the jack farther up the tongue that are already there , but then the tail gate isn't going to be able to go down , I have another jack with the weld-ment to the trailer and a pin to rotate it horizontal when not in use but there isn't room for it stow unless I get a second weld-ment and mount it on top the tongue instead of the side
I am looking for some suggestions on the placement and type of jack ----------------------
I could cut a spacer and put it under the triangle mounting plate of the jack , would loose a couple of inches of jack length but I use a block any ways , there are holes for the jack farther up the tongue that are already there , but then the tail gate isn't going to be able to go down , I have another jack with the weld-ment to the trailer and a pin to rotate it horizontal when not in use but there isn't room for it stow unless I get a second weld-ment and mount it on top the tongue instead of the side
Attachments
-
3.2 MB Views: 958